To provide a wastewater pumping station for Barratt Homes Harwood Park, Limefields. The Barratt Homes development is an exciting development of 3- and 4-bedrooms homes in West Lothian combining of 190 units to include a wide range of terraced, semi-detached and detached homes.

Scope
We were engaged to Design, Supply, Mechanically & Electrical install, Telemetry and Commission a wastewater pumping station via our Modular Assembly Framework, MAF.

Our Service and Delivery
Barratt Homes required a wastewater solution for their West Calder development and engaged with us for one of our Modular Assemble Framework pumping stations. Known that our products – Wet Well, Valve Chamber, and Kiosks are off Scottish Water standard specification and that we can deliver a fully operational pumping station in 14 weeks were key factors within their decision to have one installed.

  • Client: Barratt Homes
  • Services: Modular Assembly Framework
  • Sector: Development Market