Taylor Wimpey housing development at Harvieston Park contains a mixture of modern housing situated in Gorebridge, that provides much needed homes for the area. Due to the topography of the site a rising main and pumping station were required to feed wastewater to the mains sewer for treatment.

Scope
Design, manufacture, install and commission an off site build, waste water pumping station. Transport wastewater from site to Break Pressure Chamber downstream.

Our Service and Delivery
- Detailed design of the pumping station and liaising directly with the client and Scottish Water
- Fully built in house Form 1 MCC control panel 4.2kw pumps installed with 150mm discharge pipework, including all valves and instrumentation.
- Full installation and commissioning of the station
- Installation, configuration, and testing of on-site telemetry
- Provision of the operation and maintenance manual to Scottish Waters requirements.

  • Client: Taylor Wimpey
  • Services: Modular Assembly Framework
  • Sector: Development Market

“We were very impressed with the product and installation of the pumping station at Harvieston. After a tentative start due to redesigns of the site layout, the actual installation and commissioning went smoothly and was installed in a safe and timely manner.”
- Site Manager, Taylor Wimpey