Project Profile:Campbeltown WWTW (Slaty Farlan) Electrical InstallTelemetryMechanical InstallPLC Programming
Client:EPS Environmental

Slaty Farlan WWTW is situated in Campbeltown. The works carried out are the installation of pipe work for the new Aeration screens and associated valves. Also the installation of a new self cleaning strainer for the final effluent wash water booster set.

Project Scope:

_ Installation/ of:

Mechanical:

_Aeration Inlet Screen 14” stainless steel distribution pipe work

_1” stainless steel wash water pipe work

_2 x Seepex progressive cavity pumps

_Self cleaning strainer

_4” ABS strainer pipe work

_3 x ABB flow meters

_Flow control valve


Services Provided:

_ MEICA install including:

_Install all power and control cabling

_Testing of all cabling

_Supply and install instrumentation